Documented location
Genesee River channelization at Sinclair Refinery
Former Sinclair Refinery and landfill, Wellsville
Classification: Cleanup-driven river channelization · documented landfill-erosion control
Waterway history
The Genesee River forms the eastern and southern boundaries of the Sinclair site. After landfill erosion and flooding exposed waste and carried debris toward the river, agencies first built and stabilized an interim diversion berm. EPA's permanent remedy then partially channelized the river to protect the consolidated hazardous-waste landfill from erosion and inundation during a 100-year flood.
Documented change period
Interim diversion in 1983; permanent partial channelization constructed 1990–1991 and accepted 1992
Comparison sequence: Pre-remedy river · 1983 · 1990 · 1991 · 1992 · Present
What the record documents
The adjacent landfill contained approximately 230,000 cubic yards of refinery waste, including oily sludge, tank and separator sludge, off-specification products, burned Fuller's earth, acid waste, ash, tetraethyl lead, pesticides, waste oil, heavy metals, and drums. This inventory belongs to the landfill and must not be assigned uniformly to river sediment.
Environmental record
Groundwater from the site discharges toward the Genesee River, and later LNAPL sheens led to removal of affected riverbank soil and riverbed and drainage-swale sediment. A 3,300-foot collection trench and constructed wetland system now intercept and treat contaminated shallow groundwater before monitored discharge.
Why the historic waterway still matters
EPA's landfill investigation estimated that groundwater from the central landfill could reach the river in about 1.2 years under the conditions studied. River stage, flooding, bank erosion, shallow groundwater, and contaminated fill therefore formed a documented connected remedy problem.
Remediation and present status
Channelization construction began in 1990, received final inspection in 1991, and was accepted in 1992. The river work operates with the capped landfill, cutoff wall, bank protection, groundwater collection and wetland treatment, institutional controls, and long-term monitoring.
Evidence summary: DOCUMENTED cleanup-driven partial channelization and bank protection; mapped line is a generalized altered reach, not the landfill, contamination, excavation, or engineering-survey boundary.
How WNY Atlas interprets it
The solid Atlas line shows the approximate Sinclair river-remedy reach from EPA's site figures. It does not reproduce the construction centerline, pre-remedy channel, floodplain, Superfund boundary, or contaminated-sediment area.
Present-day status
The altered reach remains part of an operating Superfund remedy and must be understood with the landfill cap, bank protection, groundwater interception, and wetland treatment system.
Boundary status: Approximate Atlas trace aligned from an agency map