cleanup · Genesee County

Lapp Insulator Company

Le Roy

Approximately 66-acre electrical-insulator manufacturing property active since 1917. DEC records document oils and chlorinated solvents in defined soil and groundwater areas; cleanup has included excavation, in-situ treatment, covers, sub-slab systems and long-term groundwater management.

The documented story

What happened here?

Electrical-insulator manufacturing began at the Le Roy property in 1917. The approximately 66-acre complex produced ceramic insulators and transformer bushings; portions remained in industrial use after transformer-bushing production ended in 2004.

Historical operations used oils, petroleum products and chlorinated solvents. DEC divided the complex into investigation and treatment areas so documented source zones, groundwater conditions and occupied buildings could receive different controls.

Electrical infrastructure began with ceramics, oils, and solvent-intensive manufacturing

Lapp Insulator has operated in Le Roy since 1917 while defined source areas moved into long-term management

1917year electrical-insulator manufacturing began

1917-2004

Ceramic production supported the expanding electric grid

Lapp manufactured insulators and transformer bushings across a large industrial campus. Transformer-bushing production ended in 2004 while portions of the property continued in industrial use.

2009-2014

The remedy separated source areas from occupied buildings

DEC selected a multi-part remedy, excavated chlorinated-solvent source soil, applied in-situ treatment, and used covers and sub-slab systems where continued occupancy required additional protection.

Long-term phase

Groundwater monitoring follows the regional flow setting

The site-management plan tracks generally eastward groundwater flow and residual solvents while maintaining covers, vapor controls, land restrictions, and monitoring.

NYSDEC: Lapp Insulator site-management planNYSDEC: Lapp Insulator record of decision

Chemical guide

Chemicals named in this record

These links explain potential hazards and exposure pathways. A chemical named in a record does not establish that anyone was exposed or harmed.

Chronology

Timeline

  1. 1917

    Ceramic electrical-insulator manufacturing began at the property.

  2. 2004

    Transformer-bushing production ended, while other industrial use continued on portions of the complex.

  3. 2009

    DEC issued a Record of Decision selecting a multi-part remedy.

  4. 2014

    Chlorinated-solvent-affected soil was excavated in identified source areas.

  5. Long-term phase

    Groundwater monitoring and management continue under the site-management plan.

Environmental record

Documented impacts

  • Chlorinated volatile compounds, including TCA, TCE and PCE, affected soil or groundwater in defined areas.
  • Historical oils and petroleum products contributed additional industrial source concerns.
  • Groundwater monitoring documents generally eastward flow toward Oatka Creek, but that direction does not prove that all creek conditions originated at this property.

Response

Cleanup and controls

  • Selected source soil was excavated and disposed of off site.
  • In-situ chemical treatment addressed chlorinated compounds in portions of the subsurface.
  • Covers, sub-slab systems, institutional controls and continuing groundwater monitoring manage residual conditions.

Then and now

The site today

The property remains a managed industrial cleanup site. Its large footprint does not mean every part of the property has the same condition or remedy.