cleanup · Niagara County

Frontier Chemical — Pendleton

Pendleton / North Tonawanda

Closed Class 4 chemical cleanup site on Townline Road. This property is distinct from Frontier Chemical's Royal Avenue facility in Niagara Falls and is mapped separately to prevent their histories and remedies from being conflated.

The documented story

What happened here?

Frontier Chemical Waste Process operated an industrial-waste treatment facility in Pendleton from 1958 to 1974. The plant treated plating wastes, pickle liquors, and other acidic liquids from plating and metal-finishing businesses.

Treatment residuals were discharged into the approximately 15-acre Quarry Lake. After operations ended, much of the former process area was filled and graded, leaving contaminated sediment, soil, and groundwater that required a containment-based remedy.

Industrial liquid waste became sediment, then an engineered landfill

Frontier Chemical consolidated Quarry Lake sediment into an eleven-acre cap

11 acresapproximately, within the capped on-site landfill

1958-1974

A regional waste-treatment business discharged residuals to a quarry lake

Frontier accepted plating and metal-finishing wastes and treated acidic liquid streams. Residuals from that process accumulated in the approximately 15-acre Quarry Lake and affected soil and groundwater.

1992-1990s remedy

The cleanup moved lake sediment into engineered containment

DEC selected containment and collection in 1992. Contaminated lake sediment was excavated and consolidated within an approximately 11-acre capped landfill, paired with a subsurface barrier and groundwater collection and pretreatment.

2013-present

A changed boundary did not end site management

DEC redefined the managed site boundary in 2013 so Quarry Lake was no longer inside formal Site 932043. Cap care, groundwater systems, wetlands, runoff controls, monitoring, security, and periodic review continue.

NYSDEC: Pendleton record of decisionNYSDEC: 2025 periodic review reportNYSDEC: Pendleton document collection

News record

Major news events

Coverage selected here marks a turning point in public awareness, policy, enforcement, employment, or cleanup. Links open at the original publisher or archive; WNYAtlas does not reproduce restricted articles or images.

Local

New York selects removal and treatment for a small chemical-handling property

The state remedy addressed contaminated soil, tanks and containers, and groundwater rather than treating the Townline Road operation as part of Frontier Chemical's separate Niagara Falls facility.

New York State Department of Environmental Conservation
Local

The visible chemical inventory leaves; groundwater stewardship remains

Long-term reports track the remedy, monitoring, and institutional controls after source removal. The documented human consequence is prolonged uncertainty and land-use management, not a verified finding of illness among neighbors.

New York State Department of Environmental Conservation

Chronology

Timeline

  1. 1958–1974

    Frontier Chemical treated plating and metal-finishing wastes at the Pendleton facility.

  2. Post-1974

    Waste-treatment operations ended and portions of the process area were filled and graded.

  3. 1992

    DEC selected a containment and collection remedy in the site's Record of Decision.

  4. 1990s

    Contaminated lake sediment was removed and consolidated in an on-site engineered landfill.

  5. 2013

    DEC redefined the managed site boundary so that Quarry Lake was no longer inside the formal Site 932043 boundary.

  6. Present

    The capped landfill and groundwater collection and pretreatment system operate under long-term management.

Environmental record

Documented impacts

  • Plating wastes, pickle liquors, and acidic industrial liquids generated contaminated treatment residuals.
  • Quarry Lake sediment received residuals from the waste-treatment process.
  • Contaminated soil and groundwater required containment and hydraulic control.

Response

Cleanup and controls

  • Contaminated lake sediment was excavated and placed within an approximately 11-acre on-site capped landfill.
  • A subsurface containment boundary and groundwater collection, conveyance, and pretreatment system limit migration.
  • Fencing, cap maintenance, wetland-area controls, monitoring, and annual periodic review preserve the remedy.

Then and now

The site today

The Pendleton site is a closed Class 4 facility with waste consolidated and managed on site. The latest reviewed periodic report documents the cap, collection and pretreatment system, wetlands, runoff controls, monitoring network, and security features. It is entirely distinct from Frontier Chemical's Royal Avenue facility in Niagara Falls, which has a different operating history and remedy.

Research status

Open questions

  • Track current groundwater-system performance and Quarry Lake monitoring in future periodic reviews.
  • Map the capped landfill, Quarry Lake, wetlands, former process area, and larger surrounding property as separate features, preserving DEC's 2013 site-boundary change.