Former refinery-area brownfield where cleanup removed more than 10,000 feet of abandoned refinery piping, approximately 52,000 tons of petroleum-affected soil and approximately 2,000 tons of arsenic-affected soil before controlled commercial reuse.

The documented story

What happened here?

The 251 Homer Street property is part of Olean's former refinery and petroleum-handling landscape. Its cleanup provides unusually concrete documentation of how buried refinery infrastructure, petroleum-affected soil, arsenic, and creek sediment were addressed.

The parcel's remedy is one completed part of the larger refinery corridor; its excavation totals and controls should not be assigned to 1641 River Street or other neighboring properties.

A buried refinery was taken apart pipe by pipe

At 251 Homer Street, cleanup exposed the physical skeleton of Olean's oil era

52,000 tonsapproximately, petroleum-affected soil removed

About 1876-1954

Refining made Olean a petroleum center

Refinery, storage, transfer, and pipeline systems extended across a broad industrial district rather than one modern tax parcel. The Homer Street property inherited subsurface infrastructure and residual impacts from that shared operating landscape.

Investigation and excavation

More than ten thousand feet of pipe remained underground

Cleanup removed over 10,000 feet of abandoned refinery piping, demonstrating how much of the former operation survived below grade after the visible plant disappeared.

Completed remedy

Soil removal made controlled reuse possible

Approximately 52,000 tons of petroleum-affected soil and about 2,000 tons of arsenic-affected soil were removed. Remaining controls and the cleanup boundary define the commercial reuse standard.

NYSDEC: 251 Homer Street completion fact sheetNYSDEC: remedial investigation and interim-action report

Chemical guide

Chemicals named in this record

These links explain potential hazards and exposure pathways. A chemical named in a record does not establish that anyone was exposed or harmed.

Chronology

Timeline

  1. Historic refinery era

    Refinery piping and petroleum operations occupied the Homer Street area.

  2. 2012–2016

    Investigation and interim cleanup removed piping and large volumes of affected soil.

  3. Remedial completion

    Creek restoration, cover installation, and legal controls completed the physical remedy for restricted reuse.

  4. 2017

    DEC certified that the Brownfield Cleanup Program requirements had been achieved.

  5. Present

    Commercial-use controls, an environmental easement, cover maintenance, and site management continue.

Environmental record

Documented impacts

  • Petroleum contamination affected soil and portions of creek soil or sediment.
  • Arsenic-affected soil was identified and removed in designated areas.

Response

Cleanup and controls

  • More than 10,000 feet of refinery piping, approximately 52,000 tons of petroleum-affected soil, and approximately 2,000 tons of arsenic-affected soil were removed.
  • Two Mile Creek was restored after affected soil and sediment removal.
  • A site-wide cover, environmental easement, groundwater restrictions, and a site-management plan support restricted reuse.

Then and now

The site today

Major remedial construction is complete, but the property remains restricted to commercial or industrial use under continuing controls.