Former silicon-carbide heating-element and electronic-component plant at Hyde Park Boulevard and Rhode Island Street. Spent chlorinated solvents affected soil and groundwater, with TCE and breakdown products central to the remedy. Source soil was removed, while residual groundwater contamination remains under monitoring and site management.

The documented story

What happened here?

Carborundum acquired the former Globar plant in 1936 and manufactured silicon-carbide heating elements and electronic components at the Hyde Park Boulevard property. Solvents used in manufacturing and degreasing became the central cleanup issue.

DEC divided the site into soil, groundwater and off-site-soil operable units. That structure is important because source removal at the plant and continuing groundwater management represent different stages of the remedy.

Silicon-carbide manufacturing left a chlorinated-solvent groundwater legacy

Globar's source soil was removed while groundwater remained under management

1936year Carborundum acquired the Globar plant

1936 onward

Heating elements and electronics relied on solvent-intensive production

Bulk solvent storage, degreasing, and manufacturing created opportunities for spills and leaks. TCE and its breakdown products became the principal documented contaminants.

1999-2002

Major excavation removed the accessible source soil

DEC selected soil and groundwater remedies in 2000, while major removal actions in 1999 and 2002 excavated contaminated source material for off-site disposal.

Present

Groundwater is the remaining managed phase

Monitoring wells track attenuation and residual plume conditions under a site-management plan and land-use controls after soil objectives were achieved for the controlled use.

NYSDEC: Carborundum Globar record of decisionNYSDEC: Carborundum Globar document collection

Chemical guide

Chemicals named in this record

These links explain potential hazards and exposure pathways. A chemical named in a record does not establish that anyone was exposed or harmed.

Chronology

Timeline

  1. 1936 onward

    Carborundum operated the Globar manufacturing plant after acquiring the property.

  2. Investigation era

    DEC investigations identified TCE and related compounds in soil and groundwater and evaluated possible off-site pathways.

  3. 1999 and 2002

    Major source-soil removal work excavated and disposed of contaminated material off site.

  4. 2000

    DEC selected remedies for the site-soil and groundwater operable units.

  5. Present

    Residual groundwater contamination remains under monitoring and site-management controls.

Environmental record

Documented impacts

  • TCE and its breakdown products are the principal documented soil and groundwater contaminants.
  • Historical spills or leaks associated with bulk solvent storage and use created a subsurface source at the former plant.
  • DEC evaluated possible vapor, direct-contact and groundwater pathways; the 2000 decision reported that sampled shallow groundwater near residences did not show site contaminants reaching those properties through that evaluated pathway.

Response

Cleanup and controls

  • Contaminated source soil was excavated and transported off site during major remedial actions.
  • Groundwater wells track natural attenuation and residual plume conditions.
  • A site-management plan, groundwater-monitoring program and land-use controls govern material that remains.

Then and now

The site today

DEC records indicate that soil cleanup objectives were achieved for the controlled use, while groundwater remains a managed residual issue. The site pin does not assert current impacts at surrounding homes.